HOME > SYSTEM FORM-WORK > Special Feature, Merits, Faults
Keynote of system form
1) SYSTEM FORM-WORK is easy to assemble and disassemble the panel and its system that side pressure inflicted on the TIE ROD at the panel, isn't necessary any additional vertical or level post. Hence, the rate of construction is much faster and the volume of expendable materials is much reduced through the repeated use.
2) Installing any separate scaffold is not necessary because replaceable materials such as CB240 or WALKWAY is already installed on the FORM, and it is easy to assemble and disassemble forms, and to sand the surface of cured structure.
3) Curving by side pressure is rare when concreting and suitable for the construction with precision rate.
4) In the case of WALL CLIMBING SYSTEM FORM-WORK, construction is very safe and superior because scaffoldings are installed on all upper, mid, lower forms.
5) After the concreting work, the surface of concrete structure is sleek and is long lasted as it is.
Merits of System form
1) Both the panel for form-work & scaffolding for finishing work are combined as a single structure.
2) Safe when working even at the high place.
3) Minute damages for the concrete structure when disassembling
4) Possible to shorten the duration with even a few laborers through using machineries.
5) Possible to accurately construct even for complex structures.
6) Possible to control the working pace.
Faults of System form
1) Need machineries and more care for moving forms.